Please use this identifier to cite or link to this item:
https://dr.ddn.upes.ac.in//xmlui/handle/123456789/3638| Title: | Analysis, review and remedial measures for the better performance of the pipe line construction activities |
| Authors: | Sharma, Pranjal |
| Keywords: | Dissertation Chemical Engineering Pipeline Engineering Pipeline Project Pipeline Construction Civil Engineering |
| Issue Date: | Apr-2009 |
| Publisher: | College of Engineering, UPES, Dehradun |
| Citation: | Under the guidance of Mr. Param Shivam, Project Manager, Kazstory Services Pvt. Ltd., Rajkot |
| Description: | Submitted in partial fulfillment of the requirement for the degree of M. Tech (Pipeline Engineering) |
| URI: | http://hdl.handle.net/123456789/3638 |
| Appears in Collections: | Post Graduate |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.