Please use this identifier to cite or link to this item:
https://dr.ddn.upes.ac.in//xmlui/handle/123456789/3695| Title: | Maximizing the generation profit of runoff river hydro power plant considering the operations limitation i.e. water inflow forecasting and load forecasting while hedging against CERC regulation |
| Authors: | Sobti, Sameer |
| Keywords: | Dissertation Business Administration Power Management Hydro Power Plant Water Inflow Forecasting Water Load Forecasting Deviation Settlement Mechanism |
| Issue Date: | Oct-2019 |
| Publisher: | College of Management and Economics Studies, UPES, Dehradun |
| Citation: | Under the guidance of Mr. Pankaj Kapoor, Associate Vice President (O&M), AD Hydro Power Ltd. |
| Description: | Submitted in partial fulfillment of the requirement for the degree of MBA (Power Management) |
| URI: | http://hdl.handle.net/123456789/3695 |
| Appears in Collections: | Post Graduate |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| 500065977.pdf | 5.67 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.